Water treatment,Chenzhou

发布日期:2013-08-09点击量:765

Brief Introduction to the Third Waste Water Treatment Plant in Chenzhou

Located at the west bank of East River, Jintian Village, Bailutang Town, Suxian District of Chenzhou City, the Third Sewage Treatment Plant of Chenzhou City serves the Banqiao-Bailutang Cluster of the new urban district under planning, that is, the new urban district on the east of the West River, covering a population of 230,000 in the long term,daily capacity 180,000 cubic meters.Adopted in the plant is the A2/O process, namely, the anaerobic- hypoxic-aerobic treatment process as illustrated below:

The pretreatment structures like the coarse screens, booster pump chamber, fine screens and sedimentation tank remove the big-size floaters, part of the suspended matters and grains in the sewage water first; the feed water then enters the biological treatment section- the A2/O bio-tank, wher_e COD, NH3-N and total P are removed; the outlet water then enters the secondary sedimentation tank for sludge and water separation and clearing, after which the water goes to the ultraviolet disinfection tank and finally discharged to the East River nearby. Most of the sludge at the bottom of the secondary sedimentation tank is returned to the A2/O bio-tank, while a small portion is pumped to the sludge storage tank, and removed and buried in fillings afterwards after dewatering via the belt filtering press.

The designed indexes of quality of water entering the plant are COD 280mg/l, BOD5 130 mg/l, SS 220 mg/l, TN 30 mg/L, NH3-N 20 mg/l and TP 3 mg/l;while the outlet water quality shall meet Grade-1 B standards of Discharge Criteria of Pollutants for Municipal Waste-water Treatment Plants, specifically: COD ≤60mg/l, BOD5≤20 mg/l, SS ≤20 mg/l, TN ≤20 mg/l, NH3-N ≤8 mg/l and TP ≤1.0 mg/l. Annually, the plant could reduce the discharge of COD    by 15,000 tons;BOD by 1,807 tons;SS by 3,285 tons;TN by 164 tons and TP by 33 tons.

Hydrochina Zhongnan Engineering Corporation undertook this project on EPC basis,The Project was started in November, 2009.The Project was checked and accepted by the employer on December 18th, 2010. It was taken over by Guiyang City Construction Investment Company Limited on December 21st, 2012. The warranty    period stated in the contract was from December 21st, 2010 to December 20th, 2012.

 

国家部委

  • 国务院国有资产监督管理委员会
  • 中华人民共和国国家发展和改革委员会
  • 国家安全生产监督管理总局
  • 中华人民共和国住房和城乡建设部
  • 中华人民共和国外交部
  • 中华人民共和国商务部
  • 中华人民共和国财政部
  • 中华人民共和国水利部
  • 中华人民共和国交通运输部
  • 国家能源局
  • 国家铁路局

电力行业

  • 国家能源发展网
  • 国家电网企业
  • 中国南方电网有限责任企业
  • 中国华能集团企业
  • 中国大唐集团企业
  • 中国华电集团企业
  • 中国国电集团企业
  • 中国电力投资集团企业
  • 国家开发投资企业
  • 中国75888.com咨询企业
  • 国家电力信息网
  • 中国电力网

建筑行业

  • 中国建筑工程总企业
  • 中国能源建设集团有限企业
  • 中国核工业建设集团企业
  • 中国建筑材料集团有限企业
  • 中国建筑科学研究院
  • 中国铁路通信信号集团企业
  • 中国铁路工程总企业
  • 中国铁道建筑总企业
  • 中国交通建设集团有限企业
  • 中国建筑设计研究院
  • 中国葛洲坝集团企业
XML 地图 | Sitemap 地图