当前位置: 4166com金沙易记域名 >企业资讯

Water protection,Yunnan

发布日期:2013-08-09点击量:727

Profile of Waste Water treatment Plant for Industrial Use for Caopu Section, Anning, Yunnan Province

Situated at the Caopu section of the Anning Industrial Park, Yunnan Province, the water plant takes water from the Tanglangchuan, the Only water outlet of the giant Dian Lake, and supplies the water, after treatment, to major corporations such as Wuhan Iron & Steel Corporation (Kunming Facility) and CNPC located in the park for production usage. Total capacity of the project stands at 250,000 m3/d(100,000 m3/d of crude water from Tanglangchuan is supplied to Wuhan Iron & Steel Corporation; 150,000 m3/d is supplied to other companies in the park after treatment). A combined process is adopted, encompassing: first-stage coagulation and sedimentation +second-stage biochemical treatment(biological membrane A/O process)+air flotation, filtration, and in-depth treatment.

Technical course of water treatment for the project is as follows: Water intake project(shutter dam→ box type water intake head→ feed water flow pipe→ water intake pumping station)→ feed water pipe project → purification yard project (tube type static mixer→ fine screens→ mixture well → micro vortex flocculation, horizontal sedimentation tank→ biological membrane A/O process tank → coagulation air flotation tank →D-type filter → laminated water cleaning tank →chlorine disinfect → absorbing well → variable-frequency compression system)→ water transmission and supply pipe project.

Technical course for sludge treatment:

Technical course for sludge treatment is as follows: Various sludge scruff→ sludge drainage tank → sludge thickener mechanisms → sludge storage tank →sludge Dewatering house(with pressure filter)→ sludge removal and burying.

The designed indexes of quality of regenerated water are COD≤150mg/l, BOD5 ≤15 mg/l, TN≤15 mg/L, NH3-N≤10 mg/l and TP≤3mg/l; the designed water quality criteria shall be in line with the quality standard for supply water for open recycling cooling system as per Quality of Urban Waste Water Regenerated Water for Industrial Use (GB/T19923—2005), specifically COD ≤60mg/l, BOD5≤10 mg/l, NH3-N ≤10 mg/l, and turbidity≤3. This project could reduce discharge of COD by 8,000 tons per annum.

Hydrochina Zhongnan Engineering Corporation undertook this project on EPC basis,The project started on March 8th, 2011, and checked and accepted on December 18th, 2013.

 

国家部委

  • 国务院国有资产监督管理委员会
  • 中华人民共和国国家发展和改革委员会
  • 国家安全生产监督管理总局
  • 中华人民共和国住房和城乡建设部
  • 中华人民共和国外交部
  • 中华人民共和国商务部
  • 中华人民共和国财政部
  • 中华人民共和国水利部
  • 中华人民共和国交通运输部
  • 国家能源局
  • 国家铁路局

电力行业

  • 国家能源发展网
  • 国家电网企业
  • 中国南方电网有限责任企业
  • 中国华能集团企业
  • 中国大唐集团企业
  • 中国华电集团企业
  • 中国国电集团企业
  • 中国电力投资集团企业
  • 国家开发投资企业
  • 中国75888.com咨询企业
  • 国家电力信息网
  • 中国电力网

建筑行业

  • 中国建筑工程总企业
  • 中国能源建设集团有限企业
  • 中国核工业建设集团企业
  • 中国建筑材料集团有限企业
  • 中国建筑科学研究院
  • 中国铁路通信信号集团企业
  • 中国铁路工程总企业
  • 中国铁道建筑总企业
  • 中国交通建设集团有限企业
  • 中国建筑设计研究院
  • 中国葛洲坝集团企业
XML 地图 | Sitemap 地图